Lift Station #12 Rehabilitation (CDBG)

This project includes the rehabilitation of the City of Holly Hill Lift Station #12 located on Center Lane. The project includes the conversion of the can lift station into a submersible station, demolition of 2 existing pumps, piping, and valves to abandon pump can. Installation of 2 new submersible pumps, wet well upgrades, top slab, […]

April 20, 2016 in Construction by

Water System Improvements Between US-1 and Riverside Drive – Phase II

In 2013/2014 the City let a construction project known as “Water System Improvements Between US1 and Riverside Drive,” hereinafter referred to as Phase I. As part of Phase I, contract documents (plans and specifications) for replacement of all small diameter water mains between US1 and Riverside Drive from Plaza Grande Avenue to Mason Avenue were […]

April 20, 2016 in Construction by

Ross Point Playground – CDBG

The City of Holly Hill will be removing the existing swings and installing a new playground at Ross Point, located at 611 Riverside Drive.  The new playground will offer multiple play structures, borders, geotextile, playground grade mulch and an ADA ramp. This work is anticipated to be completed by September 2016, and is being funded […]

April 20, 2016 in Construction by

7th Street Neighborhood Park Improvements

The 7th Street Neighborhood Park is located at the corner of 7th Street and Center Avenue.  The park site was purchased by the City in 2002 as part of a program to provide stormwater management facilities.  Subsequently a retention pond was developed on the parcel and a fountain was placed in the pond to provide […]

April 20, 2016 in Construction by

Public Works Complex Main Switchgear Replacement

This project is replacing the existing main electrical switchgear at the public works complex. This equipment serves the entire Public Works compound, including the  water and wastewater treatment plants. A switchgear is essentially a large industrial size circuit breaker panel, with breakers the size of a small dishwasher, and electric controls to operate all the […]

April 20, 2016 in Construction by

Riverside Drive Pedestrian Bridge Replacement.

Currently a portion of the City’s sidewalk along the east side of Riverside Drive transitions from concrete sidewalk to wooden walkway over a marsh area of the Halifax River. This bridge is in an advanced stage of decay. The City would like to remove the wooden walkway and replace it with a bridge constructed from […]

April 19, 2016 in Construction by

7TH Street Drainage Replacement

The City of Holly Hill wishes to replace the existing stormwater system along 7th Street from Datona to the Halifax River. This 12-inch clay pipe system, which is approximately 100 years old, is failing in multiple locations and is undersized. The City wishes to replace this piping and intakes with a properly sized piping system. […]

April 19, 2016 in Construction by

Raw Water Main Relocation Jimmy Ann Blvd to Derbyshire

Volusia County and the City of Holly Hill have executed a Joint Project Agreement (JPA) to coordinate and accomplish all aspects of both the County road Work project on LPGA from Jimmy Ann to Derbyshire. This project is widening LPGA Blvd between Derbyshire and Jimmy Ann will not cause any service outages to the customers […]

April 19, 2016 in Construction by

Sunrise Park South Boat Ramp Improvements

The Sunrise Park South Boat Ramp Improvements include  access channel dredging out to the main channel in the river, with channel markers and access channel lighting, boat ramp improvements, a kayak/canoe launch, 2 new handicapped parking spaces, 20 additional boat trailer parking spaces and 2 new picnic pavilions. To date the City obtained a grant […]

April 19, 2016 in Construction by

close window

Service Times & Directions

Weekend Masses in English

Saturday Morning: 8:00 am

Saturday Vigil: 4:30 pm

Sunday: 7:30 am, 9:00 am, 10:45 am,
12:30 pm, 5:30 pm

Weekend Masses In Español

Saturday Vigil: 6:15pm

Sunday: 9:00am, 7:15pm

Weekday Morning Masses

Monday, Tuesday, Thursday & Friday: 8:30 am

map
6654 Main Street
Wonderland, AK 45202
(513) 555-7856