FAQs: Frequently Asked Questions

Potable Water Standard Construction Details

Potable Water Standard Construction Details

Roads Standard Construction Details

DETAIL
TITLE
DATE
R-1 50’ OR 60’ R/W ROAD SECTION 9/10
R-2 60’ R/W WITH DITCH ROAD SECTION 9/10
R-3A 80’ R/W WITH MEDIAN AND DITCH ROAD SECTION 9/10
R-3B 80’ R/W WITH MEDIAN AND DITCH ROAD SECTION 9/10
R-4A 100’ R/W WITH 5 LANE ROAD SECTION 9/10
R-4B 100’ R/W WITH 5 LANE ROAD SECTION 9/10
R-5 100’ R/W WITH 4 LANE AND MEDIAN ROAD SECTION 9/10
R-6 ROADWAY GEOMETRY 9/10
R-7 STANDARD CUL‐DE‐SAC DETAIL WITH SINGLE STORM INLET 9/10
R-8 STANDARD CUL‐DE‐SAC DETAIL WITH DUAL STORM INLET 9/10
R-9 STANDARD CURB CONSTRUCTION 9/10
R-10 ROADWAY INTERSECTION VALLEY GUTTER 9/10
R-11 PAVEMENT BUTT JOINT 9/10
R-12 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-13 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-14 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-15 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-16 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-17 ROADWAY AND PARKING AREA DESIGN AND CONSTRUCTION NOTES 9/10
R-18 TECHNICAL SPECIFICATIONS FOR SITE PLANS AND SUBDIV. TESTING 9/10
R-19 CONCRETE PAVEMENT DETAILS 9/10
R-20 SUBDIVISION TECHNICAL SPECIFICATIONS; SODDING, SEEDING AND MULCHING 9/10
R-21A ROADWAY AND MISCELLANEOUS LANDSCAPING DESIGN AND CONSTRUCTION NOTES 9/10
R-21B ROADWAY AND MISCELLANEOUS LANDSCAPING DESIGN AND CONSTRUCTION NOTES 9/10
R-22 SILT FENCE TURBIDITY BARRIER 9/10
R-23 TREE PROTECTION BARRICADE 9/10
R-24 FLOATING TURBIDITY BARRIER 9/10
R-25 CONTRACTOR REQUIREMENTS FOR SITE CLEARING, GRADING, AND EROSION CONTROL DESIGN AND CONSTRUCTION NOTES 9/10
R-26 CONTRACTOR REQUIREMENTS FOR SITE CLEARING, GRADING, AND EROSION CONTROL DESIGN AND CONSTRUCTION NOTES 9/10
R-27 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 9/10